WIP: v0.3.0 rewrite for protobuf openmetrics interface #2

Draft
evlli wants to merge 1 commit from evlli/dev-v0.3 into main
Owner
No description provided.
wip, fixme
Some checks failed
Build legacy Nix package on Ubuntu / build (pull_request) Has been cancelled
d32017e0c4
evlli force-pushed evlli/dev-v0.3 from d32017e0c4
Some checks failed
Build legacy Nix package on Ubuntu / build (pull_request) Has been cancelled
to 8ad607d65a
Some checks failed
Build legacy Nix package on Ubuntu / build (pull_request) Failing after 18m19s
2026-04-26 20:22:22 +02:00
Compare
Some checks failed
Build legacy Nix package on Ubuntu / build (pull_request) Failing after 18m19s
This pull request has changes conflicting with the target branch.
  • README.md
View command line instructions

Manual merge helper

Use this merge commit message when completing the merge manually.

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin evlli/dev-v0.3:evlli/dev-v0.3
git switch evlli/dev-v0.3

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch main
git merge --no-ff evlli/dev-v0.3
git switch evlli/dev-v0.3
git rebase main
git switch main
git merge --ff-only evlli/dev-v0.3
git switch evlli/dev-v0.3
git rebase main
git switch main
git merge --no-ff evlli/dev-v0.3
git switch main
git merge --squash evlli/dev-v0.3
git switch main
git merge --ff-only evlli/dev-v0.3
git switch main
git merge evlli/dev-v0.3
git push origin main
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
evlli/openmetrics-vici-exporter!2
No description provided.